550t Gantry Crane
550t-gantry-crane (1).webp
550t-gantry-crane.webp
550t-gantry-crane-load-test (1).webp
550t-gantry-crane-load-test.webp
550t-gantry-crane (1).webp
550t-gantry-crane.webp
550t-gantry-crane-load-test (1).webp
550t-gantry-crane-load-test.webp
Authentication mark:
CCC
CE
Capacity:
550t (275+275t)
Voltage/Hertz:
3 phase 50Hz 380V
CONSULT
Product Overview
Features
Customized
Product Overview

Independently researched, developed and manufactured by Weihua, this 550-ton gantry crane has successfully passed full load testing at a construction site in Guangdong, China. With a rated lifting capacity of 550 tons and a trolley track gauge of 10 meters, this equipment sets a new internal tonnage record for Weihua’s U-type double girder gantry crane series.

Features

Dual 275-ton lifting point system

The main lifting system adopts dual 275-ton lifting points, supporting both independent and synchronous operation. Equipped with synchronized control logic, the two lifting units can complete hoisting and lowering actions simultaneously with high coordination, ensuring stable and precise heavy-load handling.

Variable frequency and PLC integrated control

All operating mechanisms adopt variable frequency and PLC integrated control technology. The system enables flexible switching between fast and slow speed operation under full-load and light-load conditions, delivering stable lifting and travelling performance with minimal mechanical impact and low operating noise.

Lightweight optimized structural design

The whole machine adopts an optimized lightweight design. Finite element analysis is applied for steel structure calculation to meet standard strength and rigidity requirements. The compact structural layout effectively reduces self-weight and wheel pressure, achieving lower energy consumption during long-term operation.

Multi-stage balance beam travelling mechanism

The crane travelling mechanism adopts a combined structure of multi-stage balance beams and wheel bogies. Huff hinge connections between bogies and balance beams ensure even force distribution on each walking wheel, providing smoother, safer and more reliable travelling performance.

Continuous innovation for intelligent and green lifting solutions

Driven by technological innovation, Weihua continuously upgrades core technologies for high-end, intelligent and green lifting equipment. Our products have been widely applied in national key projects, including Olympic facilities construction, West-to-East Gas Transmission, South-to-North Water Diversion and Hangzhou Bay Bridge projects. Facing evolving industrial trends, Weihua leverages technical resources and industrial advantages to promote internationalization, digitalization, intelligence and green development, continuously empowering the high-quality upgrading of the manufacturing industry.

Customized

Weihua Crane provides fully customized 550-ton gantry crane solutions designed for heavy industrial manufacturing, large equipment assembly and heavy-load yard operations. Engineered for ultra-heavy cargo handling, this gantry crane delivers exceptional lifting capacity, precise positioning performance and stable operation under demanding working conditions.

Core technical parameters including lifting capacity, working span, lifting height and rail gauge can be flexibly customized according to different workshop layouts and heavy-duty operation requirements. The optimized configuration ensures safe, efficient and reliable lifting performance for large-scale industrial projects.

Optional Configurations

  • Electric and hybrid trolley drive systems

  • Automatic control and remote operation platforms

  • Professional anti-sway and high-precision positioning system for accurate super-heavy cargo handling

  • Energy-efficient drive units equipped with regenerative braking function

  • Custom structural design to match exclusive yard track layouts and special industrial applications

Supported by a professional engineering team, Weihua Crane ensures high working efficiency, operational safety and long-term equipment stability, delivering advanced heavy-duty lifting solutions for large equipment assembly yards and major industrial engineering projects.

Have Concerns? Feel Free to Connect