Weihua has successfully provided a complete lifting solution for the Xiangyang Inland River Port project in China. Located in the Xiaohe Port District, the comprehensive terminal is designed with 21 berths and an annual cargo handling capacity of 15.1 million tons, serving the transportation of general cargo, sand, gravel, bulk materials, and standard containers.
The terminal extends approximately 2,495 meters along the riverbank and covers a land area of 1.36 million square meters. The first construction phase was completed within only three months and has been operating smoothly since commissioning. At present, four general cargo berths and three bulk cargo handling lines are in full operation. As of February 25, the terminal had recorded a total cargo throughput of 60,500 tons and container throughput of 106 TEUs.

Comprehensive Material Handling Equipment
As the primary equipment supplier for both the current project and future construction phases, Weihua has delivered a wide range of material handling equipment to support terminal operations. The supplied products include:
-Bulk Material Handling Equipment
In addition to high-quality lifting equipment, Weihua also provides full lifecycle technical services together with intelligent and energy-efficient operation solutions, helping improve handling efficiency while reducing long-term operating costs.


Customer Recognition
According to Director Hu from the Comprehensive Wharf Engineering Department of Xiangyang Xiaohe Port District, Weihua's lifting equipment has demonstrated stable performance and reliable operation after several months of on-site service. The customer expressed strong satisfaction with the overall equipment quality and highly praised the performance of Weihua's newly upgraded crane models supplied for this project.